Role Summary:
The Ballast Field Manager is responsible of the ballasted construction activities including tracks installation in line or in depot and turnouts installation. The main objective is to complete the installation of track work in depot or main line according to: the technical drawings and specifications, within the forecast resources, within the programme, in line with the QC standards and in line with the EHS requirement.
Main duties and responsibilities will include;
Ensure that the works are carried out as per schedule, within the budget, in line with the quality standards and as per health and safety requirements
Ensure that the Construction Manager is aware of all site activities and personnel issues in a timely way
Write documentation (procedures, reports) related to the construction, H&S and environments requirements
Manage the supervisors and machines under his responsibility
Contact point for all third parties on site
Contact point for the Client on site, coordination of Client inspections
Liaise with the survey team for daily requirements and technical issues
Liaise with the logistic team for preparation of the daily programme and loading requirements
Issue daily construction report from daily records provided by supervisors
Ensure that supervisors have received required documents (and revisions)
Ensure that supervisors have understood health and safety requirements
Check that health and safety requirements are complied with by spot checks
Co-ordinate with the Plant Manager to ensure that both preventive and corrective maintenance is carried out in a timely way